Files
clover/docs/en/assemble_4_2.md
oponfil 7f82f8683f docs: change some fasteners (#373)
* Changed installing Raspberry Pi with M2.5 bolts

Changed installing Raspberry Pi with M2.5 bolts

* Changed installing Raspberry Pi with M2.5 bolts

Changed installing Raspberry Pi with M2.5 bolts

* Changed some fasteners

Changed some bolts from M3x8 to M3x10

* Update assemble_4_2.md

* Update assemble_4_2_pro.md

* Update assemble_4_2.md

* Update assemble_4_2_ws.md

* Update assemble_4_2.md

* Update assemble_4_2_ws.md
2021-07-16 22:32:10 +03:00

271 lines
12 KiB
Markdown
Raw Permalink Blame History

This file contains invisible Unicode characters
This file contains invisible Unicode characters that are indistinguishable to humans but may be processed differently by a computer. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Clover 4.2 assembly
Dimensional drawing  [clover-4.2.pdf](https://github.com/CopterExpress/clover/raw/master/docs/assets/dimensional-drawing/clover-4.2.pdf).
## Fasteners size
> **Hint** During assembly, screws and racks of various sizes are used, using fasteners of the wrong size can damage the copter.
<table class="type_table">
<tr>
<td><img src="../assets/assembling_clever4_2/type_size/m3x10.png" width=70 class="center"></td>
<td>Screw M3x10</td>
<td><img src="../assets/assembling_clever4_2/type_size/aluminium_40.png" width=100 class="center"></td>
<td>Aluminium rack 40 mm</td>
</tr>
<tr>
<td><img src="../assets/assembling_clever4_2/type_size/m3x8.png" width=60 class="center"></td>
<td>Screw M3x8</td>
<td><img src="../assets/assembling_clever4_2/type_size/aluminium_20.png" width=70 class="center"></td>
<td>Aluminium rack 15 mm</td>
</tr>
<tr>
<td><img src="../assets/assembling_clever4_2/type_size/m3x5.png" width=40 class="center"></td>
<td>Screw M3x5</td>
<td><img src="../assets/assembling_clever4_2/type_size/htp-40.png" width=100 class="center"></td>
<td>Nylon rack 40 mm</td>
</tr>
<tr>
<td><img src="../assets/assembling_clever4_2/type_size/m2x5.png" width=40 class="center"></td>
<td>Screw M2x5</td>
<td><img src="../assets/assembling_clever4_2/type_size/htp-30.png" width=80 class="center"></td>
<td>Nylon rack 30 mm</td>
</tr>
<tr>
<td><img src="../assets/assembling_clever4_2/type_size/nut_metal.png" width=25 class="center"></td>
<td> Nut M3 (self-locking)</td>
<td><img src="../assets/assembling_clever4_2/type_size/htp-20.png" width=70 class="center"></td>
<td>Nylon rack 20 mm</td>
</tr>
<tr>
<td><img src="../assets/assembling_clever4_2/type_size/nut_nylon.png" width=25 class="center"></td>
<td> Nut M3 (nylon)</td>
<td><img src="../assets/assembling_clever4_2/type_size/htp-15.png" width=60 class="center"></td>
<td>Nylon rack 15 mm</td>
</tr>
<tr>
<td><img src="../assets/assembling_clever4_2/type_size/dumper.png" width=50 class="center"></td>
<td>Damper rack</td>
<td><img src="../assets/assembling_clever4_2/type_size/hts-6.png" width=50 class="center"></td>
<td> Nylon rack 6 mm</td>
</tr>
</table>
## Frame Assembly
1. Align the 4 beams with the center deck, fix them with the M3x8 screws and nuts with a nylon insert.
<div class="image-group">
<img src="../assets/assembling_clever4_2/frame_1.png" width=300 class="zoom border">
<img src="../assets/assembling_clever4_2/frame_2.png" width=300 class="zoom border">
</div>
2. Install 2 aluminum 15mm posts on the center holes in the main deck and fix them with the M3x8 screws.
<img src="../assets/assembling_clever4_2/frame_3.png" width=300 class="zoom border center">
3. Install the stiffener hook into the groove in the beam.
<img src="../assets/assembling_clever4_2/frame_4.png" width=300 class="zoom border center">
4. Press the stiffeners onto the main deck.
<img src="../assets/assembling_clever4_2/frame_5.png" width=300 class="zoom border center">
5. Tighten the stiffeners with a small carbon deck.
<img src="../assets/assembling_clever4_2/frame_6.png" width=300 class="zoom border center">
6. Install 4 6mm nylon posts and fix them with the M3x5 screws.
<img src="../assets/assembling_clever4_2/frame_7.png" width=300 class="zoom border center">
## Installing motors
1. When installing motors, pay attention to the rotation scheme of the motors. The rotation marking on the motors must match the rotation pattern.
<img id="prop_rotation" src="../assets/assembling_clever4/props_rotation.png" width=300 class="zoom border center">
2. Mount the motor on the corresponding holes in the beam using **M3x5 screws**.
<div class="image-group">
<img src="../assets/assembling_clever4_2/motor_1.png" width=300 class="zoom border">
<img src="../assets/assembling_clever4_2/motor_2.png" width=300 class="zoom border">
</div>
> **Caution** Make sure that the motors are secured with M3x5 screws, otherwise a short circuit between the windings may occur.
## Installing ESC and PDB
1. Connect the speed controllers (ESC) to the motors using the MR30 connectors and fasten them to the beams using clamps.
<div class="image-group">
<img src="../assets/assembling_clever4_2/esc_1.png" width=300 class="zoom border">
<img src="../assets/assembling_clever4_2/esc_2.png" width=300 class="zoom border">
</div>
2. Install the power distribution board (PDB) on the pre-mounted racks and secure it with 6mm racks. The power distribution board must be installed so that the power connection cable points toward the tail of the aircraft.
<img src="../assets/assembling_clever4_2/pdb_1.png" width=300 class="zoom border center">
3. Connect the power outputs of the speed controllers to the power distribution board.
<img src="../assets/assembling_clever4_2/pdb_2.png" width=300 class="zoom border center">
## Installing Flight Controller
Clover 4 drone kit allows you to install various flight controllers, for example [COEX Pix](coex_pix.md) and Pixracer.
> **Caution** During installation the flight controller, pay attention to the arrow located on the board, it should be directed to the copter bow.
### COEX Pix
> **Hint** Before installing the damper struts, screw 2 layers of nylon nuts, for a stronger fix or bite off the excess thread using side cutters.
Install the damper struts, fix COEX Pix on them with nylon nuts.
<img src="../assets/assembling_clever4_2/coex_pix.png" width=300 class="zoom border center">
### Pixracer
1. Place the small deck on the racks and secure it with nylon nuts.
<img src="../assets/assembling_clever4_2/pixracer_1.png" width=300 class="zoom border center">
2. Glue 3-4 layers of double-sided tape, glue it in the center of the small deck and install Pixracer on top.
<img src="../assets/assembling_clever4_2/pixracer_2.png" width=300 class="zoom border center">
## Connect Flight Controller
1. Connect the speed controllers to the flight controller in accordance with the diagram.
<img src="../assets/assembling_clever4_2/fc_connection_1.png" width=300 class="zoom border center">
2. Connect the power cable to the power distribution board(PDB) and the corresponding connector on the flight controller.
<img src="../assets/assembling_clever4_2/fc_connection_2.png" width=300 class="zoom border center">
3. Install 40mm aluminum racks on the M3x10 screws.
<div class="image-group">
<img src="../assets/assembling_clever4_2/fc_connection_3.png" width=300 class="zoom border">
<img src="../assets/assembling_clever4_2/fc_connection_4.png" width=300 class="zoom border">
</div>
## Installing Raspberry Pi
1. Install the 20 mm racks on the main deck, fix them with the M3x8 screws.
<div class="image-group">
<img src="../assets/assembling_clever4_2/fc_connection_5.png" width=300 class="zoom border">
<img src="../assets/assembling_clever4_2/fc_connection_6.png" width=300 class="zoom border">
</div>
2. On a mounting deck, install M2.5x6 mm racks and M3x30 mm racks, fasten them with the M2.5x4 and M3x10 bolts, respectively.
<img src="../assets/assembling_clever4_2/raspberry_1.png" width=300 class="zoom border center">
3. Install the assembled mounting deck on the main deck and fix with the M3x8 screws.
<img src="../assets/assembling_clever4_2/raspberry_2.png" width=300 class="zoom border center">
4. Install the Raspberry Pi circuit board and fix with M2.5x4 bolts.
<img src="../assets/assembling_clever4_2/raspberry_3.png" width=300 class="zoom border center">
5. On the capture deck, install the rangefinder using self-locking nuts and M3x8 screws, and glue the radio using double-sided tape.
<img src="../assets/assembling_clever4_2/raspberry_5.png" width=300 class="zoom border center">
6. Install 4 20 mm racks and fix them with the M3x8 screws.
<img src="../assets/assembling_clever4_2/raspberry_6.png" width=300 class="zoom border center">
7. Install the camera on the small mounting deck and fix it with 2 M2x5 self-tapping screws in the upper left and lower right corners.
<img src="../assets/assembling_clever4_2/raspberry_7.png" width=300 class="zoom border center">
8. Install the camera module on the capture deck and fix with the M3x8 screws.
<img src="../assets/assembling_clever4_2/raspberry_8.png" width=300 class="zoom border center">
9. Install the assembled pickup deck and fix with the M3x8 screws.
<img src="../assets/assembling_clever4_2/raspberry_9.png" width=300 class="zoom border center">
10. Connect to the Raspberry Pi rangefinder and power cable.
<img src="../assets/assembling_clever4_2/raspberry_10.png" width=300 class="zoom border center">
11. Connect the camera cable to Raspberry Pi.
<img src="../assets/assembling_clever4_2/raspberry_11.png" width=300 class="zoom border center">
## Installing LED strip and legs
1. Assemble the hoop for the LED strip by combining the lock on the ends.
<img src="../assets/assembling_clever4_2/led_1.png" width=300 class="zoom border center">
2. Stick the LED strip on the hoop, for better fastening, pull it with 3-4 clamps.
<img src="../assets/assembling_clever4_2/led_2.png" width=300 class="zoom border center">
3. Install the legs on the stiffening plate using self-locking nuts and M3x8 screws using only the extreme mounting holes. From below, between the plates of the legs, install a damper silicone ring.
<img src="../assets/assembling_clever4_2/led_3.png" width=300 class="zoom border center">
4. Bend the legs back and install a hoop with LED strip in a special groove on them so that the connection cables exit from the tail side of the copter.
<img src="../assets/assembling_clever4_2/led_4.png" width=300 class="zoom border center">
5. Behind fasten the legs with self-locking nuts and M3x10 screws.
<img src="../assets/assembling_clever4_2/led_5.png" width=300 class="zoom border center">
6. Connect the LED strip power (red, black cables) to the short JST connector on the PDB.
<img src="../assets/assembling_soldering_clever_4/led_7.png" width=300 class="zoom border center">
7. Connect the signal output of the LED strip (white cable) to Raspberry Ri, to pin *GPIO21*.
<img src="../assets/assembling_soldering_clever_4/led_8.png" width=300 class="zoom border center">
## Installing guard
1. Assemble the lower level of guard with 40mm racks and M3x10 screws.
<img src="../assets/assembling_clever4_2/guard_1.png" width=300 class="zoom border center">
2. Assemble the top level of protection with the M3x10 screws.
<img src="../assets/assembling_clever4_2/guard_2.png" width=300 class="zoom border center">
3. Install the mounting deck and fix it with M3x8 bolts.
<img src="../assets/assembling_clever4_2/guard_3.png" width=300 class="zoom border center">
4. Establish protection and fix on beams by means of self-locking nuts and M3x10 screws.
<img src="../assets/assembling_clever4_2/guard_4.png" width=300 class="zoom border center">
## Flight preparation
1. Install the battery strap and connect the flight controller to the Raspberry Pi using a USB cable.
<div class="image-group">
<img src="../assets/assembling_clever4_2/final_1.png" width=300 class="zoom border">
<img src="../assets/assembling_clever4_2/final_2.png" width=300 class="zoom border">
</div>
2. Install the propellers in accordance with the [directional diagram of the motors](#prop_rotation).
<img src="../assets/assembling_clever4_2/final_3.png" width=300 class="zoom border center">
3. Install the battery.
<img src="../assets/assembling_clever4_2/final_4.png" width=300 class="zoom border center">
> **Success** The drone is assembled, then perform [setup](setup.md).