mirror of
https://github.com/CopterExpress/clover.git
synced 2026-05-26 21:19:35 +00:00
* Changed installing Raspberry Pi with M2.5 bolts Changed installing Raspberry Pi with M2.5 bolts * Changed installing Raspberry Pi with M2.5 bolts Changed installing Raspberry Pi with M2.5 bolts * Changed some fasteners Changed some bolts from M3x8 to M3x10 * Update assemble_4_2.md * Update assemble_4_2_pro.md * Update assemble_4_2.md * Update assemble_4_2_ws.md * Update assemble_4_2.md * Update assemble_4_2_ws.md
271 lines
12 KiB
Markdown
271 lines
12 KiB
Markdown
# Clover 4.2 assembly
|
||
|
||
Dimensional drawing – [clover-4.2.pdf](https://github.com/CopterExpress/clover/raw/master/docs/assets/dimensional-drawing/clover-4.2.pdf).
|
||
|
||
## Fasteners size
|
||
|
||
> **Hint** During assembly, screws and racks of various sizes are used, using fasteners of the wrong size can damage the copter.
|
||
|
||
<table class="type_table">
|
||
<tr>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/m3x10.png" width=70 class="center"></td>
|
||
<td>Screw M3x10</td>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/aluminium_40.png" width=100 class="center"></td>
|
||
<td>Aluminium rack 40 mm</td>
|
||
</tr>
|
||
<tr>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/m3x8.png" width=60 class="center"></td>
|
||
<td>Screw M3x8</td>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/aluminium_20.png" width=70 class="center"></td>
|
||
<td>Aluminium rack 15 mm</td>
|
||
</tr>
|
||
<tr>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/m3x5.png" width=40 class="center"></td>
|
||
<td>Screw M3x5</td>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/htp-40.png" width=100 class="center"></td>
|
||
<td>Nylon rack 40 mm</td>
|
||
</tr>
|
||
<tr>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/m2x5.png" width=40 class="center"></td>
|
||
<td>Screw M2x5</td>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/htp-30.png" width=80 class="center"></td>
|
||
<td>Nylon rack 30 mm</td>
|
||
</tr>
|
||
<tr>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/nut_metal.png" width=25 class="center"></td>
|
||
<td> Nut M3 (self-locking)</td>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/htp-20.png" width=70 class="center"></td>
|
||
<td>Nylon rack 20 mm</td>
|
||
</tr>
|
||
<tr>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/nut_nylon.png" width=25 class="center"></td>
|
||
<td> Nut M3 (nylon)</td>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/htp-15.png" width=60 class="center"></td>
|
||
<td>Nylon rack 15 mm</td>
|
||
</tr>
|
||
<tr>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/dumper.png" width=50 class="center"></td>
|
||
<td>Damper rack</td>
|
||
<td><img src="../assets/assembling_clever4_2/type_size/hts-6.png" width=50 class="center"></td>
|
||
<td> Nylon rack 6 mm</td>
|
||
</tr>
|
||
</table>
|
||
|
||
## Frame Assembly
|
||
|
||
1. Align the 4 beams with the center deck, fix them with the M3x8 screws and nuts with a nylon insert.
|
||
|
||
<div class="image-group">
|
||
<img src="../assets/assembling_clever4_2/frame_1.png" width=300 class="zoom border">
|
||
<img src="../assets/assembling_clever4_2/frame_2.png" width=300 class="zoom border">
|
||
</div>
|
||
|
||
2. Install 2 aluminum 15mm posts on the center holes in the main deck and fix them with the M3x8 screws.
|
||
|
||
<img src="../assets/assembling_clever4_2/frame_3.png" width=300 class="zoom border center">
|
||
|
||
3. Install the stiffener hook into the groove in the beam.
|
||
|
||
<img src="../assets/assembling_clever4_2/frame_4.png" width=300 class="zoom border center">
|
||
|
||
4. Press the stiffeners onto the main deck.
|
||
|
||
<img src="../assets/assembling_clever4_2/frame_5.png" width=300 class="zoom border center">
|
||
|
||
5. Tighten the stiffeners with a small carbon deck.
|
||
|
||
<img src="../assets/assembling_clever4_2/frame_6.png" width=300 class="zoom border center">
|
||
|
||
6. Install 4 6mm nylon posts and fix them with the M3x5 screws.
|
||
|
||
<img src="../assets/assembling_clever4_2/frame_7.png" width=300 class="zoom border center">
|
||
|
||
## Installing motors
|
||
|
||
1. When installing motors, pay attention to the rotation scheme of the motors. The rotation marking on the motors must match the rotation pattern.
|
||
|
||
<img id="prop_rotation" src="../assets/assembling_clever4/props_rotation.png" width=300 class="zoom border center">
|
||
|
||
2. Mount the motor on the corresponding holes in the beam using **M3x5 screws**.
|
||
|
||
<div class="image-group">
|
||
<img src="../assets/assembling_clever4_2/motor_1.png" width=300 class="zoom border">
|
||
<img src="../assets/assembling_clever4_2/motor_2.png" width=300 class="zoom border">
|
||
</div>
|
||
|
||
> **Caution** Make sure that the motors are secured with M3x5 screws, otherwise a short circuit between the windings may occur.
|
||
|
||
## Installing ESC and PDB
|
||
|
||
1. Connect the speed controllers (ESC) to the motors using the MR30 connectors and fasten them to the beams using clamps.
|
||
|
||
<div class="image-group">
|
||
<img src="../assets/assembling_clever4_2/esc_1.png" width=300 class="zoom border">
|
||
<img src="../assets/assembling_clever4_2/esc_2.png" width=300 class="zoom border">
|
||
</div>
|
||
|
||
2. Install the power distribution board (PDB) on the pre-mounted racks and secure it with 6mm racks. The power distribution board must be installed so that the power connection cable points toward the tail of the aircraft.
|
||
|
||
<img src="../assets/assembling_clever4_2/pdb_1.png" width=300 class="zoom border center">
|
||
|
||
3. Connect the power outputs of the speed controllers to the power distribution board.
|
||
|
||
<img src="../assets/assembling_clever4_2/pdb_2.png" width=300 class="zoom border center">
|
||
|
||
## Installing Flight Controller
|
||
|
||
Clover 4 drone kit allows you to install various flight controllers, for example [COEX Pix](coex_pix.md) and Pixracer.
|
||
|
||
> **Caution** During installation the flight controller, pay attention to the arrow located on the board, it should be directed to the copter bow.
|
||
|
||
### COEX Pix
|
||
|
||
> **Hint** Before installing the damper struts, screw 2 layers of nylon nuts, for a stronger fix or bite off the excess thread using side cutters.
|
||
|
||
Install the damper struts, fix COEX Pix on them with nylon nuts.
|
||
|
||
<img src="../assets/assembling_clever4_2/coex_pix.png" width=300 class="zoom border center">
|
||
|
||
### Pixracer
|
||
|
||
1. Place the small deck on the racks and secure it with nylon nuts.
|
||
|
||
<img src="../assets/assembling_clever4_2/pixracer_1.png" width=300 class="zoom border center">
|
||
|
||
2. Glue 3-4 layers of double-sided tape, glue it in the center of the small deck and install Pixracer on top.
|
||
|
||
<img src="../assets/assembling_clever4_2/pixracer_2.png" width=300 class="zoom border center">
|
||
|
||
## Connect Flight Controller
|
||
|
||
1. Connect the speed controllers to the flight controller in accordance with the diagram.
|
||
|
||
<img src="../assets/assembling_clever4_2/fc_connection_1.png" width=300 class="zoom border center">
|
||
|
||
2. Connect the power cable to the power distribution board(PDB) and the corresponding connector on the flight controller.
|
||
|
||
<img src="../assets/assembling_clever4_2/fc_connection_2.png" width=300 class="zoom border center">
|
||
|
||
3. Install 40mm aluminum racks on the M3x10 screws.
|
||
|
||
<div class="image-group">
|
||
<img src="../assets/assembling_clever4_2/fc_connection_3.png" width=300 class="zoom border">
|
||
<img src="../assets/assembling_clever4_2/fc_connection_4.png" width=300 class="zoom border">
|
||
</div>
|
||
|
||
## Installing Raspberry Pi
|
||
|
||
1. Install the 20 mm racks on the main deck, fix them with the M3x8 screws.
|
||
|
||
<div class="image-group">
|
||
<img src="../assets/assembling_clever4_2/fc_connection_5.png" width=300 class="zoom border">
|
||
<img src="../assets/assembling_clever4_2/fc_connection_6.png" width=300 class="zoom border">
|
||
</div>
|
||
|
||
2. On a mounting deck, install M2.5x6 mm racks and M3x30 mm racks, fasten them with the M2.5x4 and M3x10 bolts, respectively.
|
||
|
||
<img src="../assets/assembling_clever4_2/raspberry_1.png" width=300 class="zoom border center">
|
||
|
||
3. Install the assembled mounting deck on the main deck and fix with the M3x8 screws.
|
||
|
||
<img src="../assets/assembling_clever4_2/raspberry_2.png" width=300 class="zoom border center">
|
||
|
||
4. Install the Raspberry Pi circuit board and fix with M2.5x4 bolts.
|
||
|
||
<img src="../assets/assembling_clever4_2/raspberry_3.png" width=300 class="zoom border center">
|
||
|
||
5. On the capture deck, install the rangefinder using self-locking nuts and M3x8 screws, and glue the radio using double-sided tape.
|
||
|
||
<img src="../assets/assembling_clever4_2/raspberry_5.png" width=300 class="zoom border center">
|
||
|
||
6. Install 4 20 mm racks and fix them with the M3x8 screws.
|
||
|
||
<img src="../assets/assembling_clever4_2/raspberry_6.png" width=300 class="zoom border center">
|
||
|
||
7. Install the camera on the small mounting deck and fix it with 2 M2x5 self-tapping screws in the upper left and lower right corners.
|
||
|
||
<img src="../assets/assembling_clever4_2/raspberry_7.png" width=300 class="zoom border center">
|
||
|
||
8. Install the camera module on the capture deck and fix with the M3x8 screws.
|
||
|
||
<img src="../assets/assembling_clever4_2/raspberry_8.png" width=300 class="zoom border center">
|
||
|
||
9. Install the assembled pickup deck and fix with the M3x8 screws.
|
||
|
||
<img src="../assets/assembling_clever4_2/raspberry_9.png" width=300 class="zoom border center">
|
||
|
||
10. Connect to the Raspberry Pi rangefinder and power cable.
|
||
|
||
<img src="../assets/assembling_clever4_2/raspberry_10.png" width=300 class="zoom border center">
|
||
|
||
11. Connect the camera cable to Raspberry Pi.
|
||
|
||
<img src="../assets/assembling_clever4_2/raspberry_11.png" width=300 class="zoom border center">
|
||
|
||
## Installing LED strip and legs
|
||
|
||
1. Assemble the hoop for the LED strip by combining the lock on the ends.
|
||
|
||
<img src="../assets/assembling_clever4_2/led_1.png" width=300 class="zoom border center">
|
||
|
||
2. Stick the LED strip on the hoop, for better fastening, pull it with 3-4 clamps.
|
||
|
||
<img src="../assets/assembling_clever4_2/led_2.png" width=300 class="zoom border center">
|
||
|
||
3. Install the legs on the stiffening plate using self-locking nuts and M3x8 screws using only the extreme mounting holes. From below, between the plates of the legs, install a damper silicone ring.
|
||
|
||
<img src="../assets/assembling_clever4_2/led_3.png" width=300 class="zoom border center">
|
||
|
||
4. Bend the legs back and install a hoop with LED strip in a special groove on them so that the connection cables exit from the tail side of the copter.
|
||
|
||
<img src="../assets/assembling_clever4_2/led_4.png" width=300 class="zoom border center">
|
||
|
||
5. Behind fasten the legs with self-locking nuts and M3x10 screws.
|
||
|
||
<img src="../assets/assembling_clever4_2/led_5.png" width=300 class="zoom border center">
|
||
|
||
6. Connect the LED strip power (red, black cables) to the short JST connector on the PDB.
|
||
|
||
<img src="../assets/assembling_soldering_clever_4/led_7.png" width=300 class="zoom border center">
|
||
|
||
7. Connect the signal output of the LED strip (white cable) to Raspberry Ri, to pin *GPIO21*.
|
||
|
||
<img src="../assets/assembling_soldering_clever_4/led_8.png" width=300 class="zoom border center">
|
||
|
||
## Installing guard
|
||
|
||
1. Assemble the lower level of guard with 40mm racks and M3x10 screws.
|
||
|
||
<img src="../assets/assembling_clever4_2/guard_1.png" width=300 class="zoom border center">
|
||
|
||
2. Assemble the top level of protection with the M3x10 screws.
|
||
|
||
<img src="../assets/assembling_clever4_2/guard_2.png" width=300 class="zoom border center">
|
||
|
||
3. Install the mounting deck and fix it with M3x8 bolts.
|
||
|
||
<img src="../assets/assembling_clever4_2/guard_3.png" width=300 class="zoom border center">
|
||
|
||
4. Establish protection and fix on beams by means of self-locking nuts and M3x10 screws.
|
||
|
||
<img src="../assets/assembling_clever4_2/guard_4.png" width=300 class="zoom border center">
|
||
|
||
## Flight preparation
|
||
|
||
1. Install the battery strap and connect the flight controller to the Raspberry Pi using a USB cable.
|
||
|
||
<div class="image-group">
|
||
<img src="../assets/assembling_clever4_2/final_1.png" width=300 class="zoom border">
|
||
<img src="../assets/assembling_clever4_2/final_2.png" width=300 class="zoom border">
|
||
</div>
|
||
|
||
2. Install the propellers in accordance with the [directional diagram of the motors](#prop_rotation).
|
||
|
||
<img src="../assets/assembling_clever4_2/final_3.png" width=300 class="zoom border center">
|
||
|
||
3. Install the battery.
|
||
|
||
<img src="../assets/assembling_clever4_2/final_4.png" width=300 class="zoom border center">
|
||
|
||
> **Success** The drone is assembled, then perform [setup](setup.md).
|